PT Duta Borneo Mining

Klien Kami

No.Nama KlienType Of LithologyStatus Of Works
1PT. Bintang Delapan Mineral
Location :Bahodopi , Sulawesi TengahExploration OF Mineral(Nickle)Completed
Depth Capacity : 0 . 00 - 50.00 m . Unit rig DBM 240(05 Mei 2010 – 30 September 2011)
HQ rods ( Full Coring )
NQ rods (Full Corring)
Drilling Performance:
Full Coring: 20.00 - 40.00 m /shift
PT. Multi Harapan Utama
2Location :Samarinda , Kalimantan TimurExploration OF CoalCompleted
Depth Capacity : 0 . 00 - 150.00 m Unit rig DBM 240(09 Nopember 2011 – 10 Maret 2012)
HQ rods ( OH ,)
Drilling Performance:
Open Hole: 50.00 - 80.00 m /shift
PT. Arutmin Indonesia
3Location :Batulicin , Kalimanatan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 120.00 m . Unit rig DBM 200(31 Desember 2011 – 31 Desember 2012)
HQ rods ( OH , TC)
Drilling Performance:
Open Hole: 50.00 - 100.00 m /shift
PT. Arutmin Indonesia
4Location :Satui , Kalimanatan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 300.00 m .Cortech 1300 L(31 Desember 2012 – 31 Desember 2013)
HQ rods ( OH , TC)
Drilling Performance:
Open Hole: 50.00 - 180.00 m /shift
PT. Bintang Delapan Energi
5Location :Batulicin ,Samboja – Kalimantan TimurExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 240(15 Maret 2011 – 31 Desember 2011)
HQ rods ( OH , TC)
Drilling Performance:
Full Coring: 50.00 m - 100.00 m /shift
PT. Kalimantan Energy Lestari
6Location : Sungai Durian Kalimanatan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 175(25 Maret 2011 – 15 September 2011)
HQ rods ( OH , TC)
Drilling Performance:
Open Hole: 50.00 - 100.00 m /shift
PT . Audita Cipta Lestari
7Location : Barito Selatan , Kalimanatan TengahExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 175(11 Oktober 2011 – 30 September 2012)
NQ - AW rods
Drilling Performance:
Open Hole: 50.00 - 100.00 m /shift
PT. Gamma Mitra Sejahtera
8Location :KutaiKartanegara , Kalimantan TimurExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 175(27 September 2011 – 20 Nopember 2011)
NQ - AW rods ( OH , TC )
Drilling Performance:
Open Hole: 50.00 m - 100.00 m /shift
PT. Gerak Bangun Sejahtera
9Location :Batulicin , Kalimanatan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 175(02 Nopember 2011 – 30 Nopember 2011)
NQ - AW rods ( OH , TC )
Drilling Performance:
Open Hole: 50.00 m - 100.00 m /shift
PT. Griya Sumber Setya
10Location : Barito Selatan , Kalimanatan TengahExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 175(10 September 2012 – 10 Mei 2013)
NQ - AW rods ( OH , TC )
Drilling Performance:
Open Hole: 50.00 m - 100.00 m /shift
PT. Sumber Permata Hitam
11Location :Samboja , Kalimantan TimurExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 240(08 Juni 2012 – 10 Agustus 2012)
HQ rods ( OH , TC )
Drilling Performance:
Open Hole: 50.00 m - 150.00 m /shift
Core 60-100 m/shift
PT. Yastra Energy ( Johnlin Group )
12Location :MuaraTewe , Kalimantan TengahExploration of CoalCompleted
Depth Capacity : 0 . 00 - 130.00 m . Unit rig DBM 240(21 Juni 2013 – 04 Oktober 2013)
HQ rods ( OH , TC )
Drilling Performance:
Open Hole: 8- - 135.00 m /shift
Full Coring: 60,00 m – 90,00 m /shift
PT Sarana Utama Niaga
13Location :Sanggau , Kalimanatan BaratExploration of Mineral(Graphite)Completed
Depth Capacity : 0 . 00 - 150.00 m . Unit rig DBM 240(21 Februari 2013 – 30 Juni 2013)
NQ rods ( Full Coring )
Drilling Performance:
Full Coring: 15.00 m - 50.00 m /shift
PT. Cahaya Duta Fajar ( Johnlin Group )
14Location :Batulicin , Kalimantan SelatanExploration of Mineral(Iron One)Completed
Depth Capacity : 0 . 00 - 300.00 m . Unit rig DBM 400(01 Januari 2014 – 23 Agustus 2014)
HQ rods ( Full Coring )
Drilling Performance:
Full Coring: 20.00 m - 62.00 m /shift
PT Batubara Selaras Saqta
15Location :Desa Lolo , Kalimantan TimurExploration of CoalCompleted
Depth Capacity : 0 . 00 - 200.00 m . Unit rig DBM 240(30 Nopember 2014 – 24 Desember 2014)
HQ rods ( Full Coring )
Drilling Performance:
Full Coring: 40.00 m - 96.00 m / shift
PT Kemilau Rindang Abadi ( Jembayan Muarabara Group )
16Location :DesaBuana Jaya Spari 3Exploration of CoalCompleted
Depth Capacity : 00.00 - 250.00 m . Unit rig DBM 300(19 Maret 2015 – 07 Mei 2015)
HQrods (OH, TC)
HQ rods ( Full Coring
Drilling Performance:
Open Hole: 130 m/shift
Full Coring: 50 -80 m / shift
PT Geotechnical & Environmental Services Indonesia (Golder Associates) Year 2015
17Location : Palaran Samarimda Kalimantan TimurGeotechnical DrillingCompleted
PT Kalimantan Surya Kencana
18Location :DesaDamang Batu , Kalimantan TengahExploration of MineralCompleted
Depth Capacity : 0 . 00 - 200.00 m . Unit rig DBM 240(07 Juli 2015 – 30 September 2015)
HQ rods ( Full Coring )
Drilling Performance:
Full core 17-32 meter/shift
PT Jhonlin Baratama
19Location :Kintap , Kalimantan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 200.00 m . Unit rig DBM 240(12 Agustus 2015 – 28 Agustus 2015)
HQ rods ( OH , TC )
Drilling Performance:
Full Coring only : 80 – 100 m /shift
PT Petrocon Indonesia
20Location :Kembang Jenggutt , Kalimantan TimurExploration of CoalCompleted
Depth Capacity : 0 . 00 - 200.00 m . Unit rig DBM 240(26 Nopember 2015 – 30 Desember 2015)
HQ rods ( OH , TC )
Drilling Performance:
Open Hole: 120.00 m /shift
Full Coring: 55- 80.00 m /shift
PT Satui Terminal Umum (Jhonlin Group)
21Location : Satui,Sungai Danau , Kalimantan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 175(21 Januari 2016 – 07 Februari 2016)
AW rods ( OH)
Drilling Performance:
Open Hole: 00.00 m - 100.00 m /shift
PT. Arutmin Indonesia ( Year 2016 )
22Location :Kintap , Kalimanatan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 240(08 Maret 2016 – 25 Maret 2016)
HQ rods ( OH , TC)
Drilling Performance:
Open Hole: 90- 120.00 m /shift
Full Coring: 70 - 80.00 m /shift
PT. Kapuas Prima Coal ( Year 2016 )
23Location :Bintang Mengalih , Kalimantan TengahExploration of MineralCompleted
Depth Capacity : 0 . 00 - 350.00 m . Unit rig DBM 400(04 April 2016 – 31 Desember 2016)
HQ rods ( coring only )
Drilling Performance:
Full Coring: 20 - 50.00 m /shift
PT. Indo Muro Mineral (PT. KBK Group) Year 2016
24Location :Bowone - Sangihe , Sulawesi UtaraExploration of MineralCompleted
Depth Capacity : 0 . 00 – 80 .00 m . Unit rig DBM 300(11 Agustus 2016 – 16 Oktober 2016)
HQ rods ( coring )
Drilling Performance:
Full Coring only HQ3 : 20 -42 meter /shift
PT. Gunung Sungkai (PT. Mining Asia Depelovment Indonesia) Year 2016
25Location : Long Adui - Malinau , Kalimantan UtaraExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 240(24 September 2016 – 16 Oktoberber 2016)
HQrods ( OH)
Drilling Performance:
Open Hole: 70 - 100 m /shift
Coring : 60 -80 mtr/ shift
PT. Geoxp ( Year 2016 )
26Location : Binuang - Tapin , Kalimantan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 – 180 .00 m . Unit rig DBM 240(22 September 2016 – 14 Nopember 2016)
Drilling performance :
Full core only HQ3 : 50 - 70.00 m /shift
PT. Arzara Baraindo Energitama (Jembayan Muarabara Group) Year 2016
27Location : Spari – Kutai Kartanegara, Kalimantan TimurExploration of CoalCompleted
Depth Capacity : 0 . 00 – 150 .00 m . Unit rig DBM 300(13 Oktober 2016 – 27 Nopember 2016)
HQ3 rods ( OH)
Drilling Performance:
Full core HQ3 only 50 – 70 m /shift
PT. Satui Terminal Umum (PT. Jhonlin Baratama) Year 2016
28Location : Satui,Sungai Danau , Kalimantan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 – 60 m . Unit rig DBM 240(21 Januari 2016 – 07 Februari 2016)
HQ rods ( OH)
Drilling Performance:
Open Hole: 40 – 80 meter /shift
Core HQ3 : 30 – 50 meter/shift
PT. Jhonlin Group ( Year 2016 )
29Location : Sibamban - Bunati , Kalimantan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 120.00 m . Unit rig DBM 240(21 Oktober 2016 – 23 Desember 2016)
HQ rods ( OH)
Drilling Performance:
Open Hole : 00.00 m - 100.00 m /shift
Core HQ3 : 60 – 80 meter/shift
PT. Arutmin Indonesia ( Year 2016 )
30Location :Kintap , Kalimanatan SelatanExploration of CoalCompleted
Depth Capacity : 0 . 00 - 100.00 m . Unit rig DBM 240(08 Maret 2016 – 25 Maret 2016)
HQ rods ( OH , TC)
Drilling Performance:
Open Hole: 90- 120.00 m /shift
Full Coring: 70 - 80.00 m /shift
PT. Asmin Bara Bronang ( Year 2017 )
31Location : Bekanon , Kalimantan TengahExploration of CoalCompleted
Unit rig DBM 175, DBM 240(03 Januari 2017 – 07 Juni 2017)
Depth Capacity : 00.00 - 120.00 m .
HQ rods ( OH)
Drilling Performance:
Open Hole : 00.00 m - 60.00 m /shift
Core HQ3 : 20 – 30 meter/shift
PT. Berau Coal ( Year 2017 )
32Location : Binungan & Sambarata , Kalimantan TimurExploration of CoalIn Progress
Unit rig DBM 300, DBM 400, DBM 500 (15 Unit)(02 Januari 2017 – Sekarang)
Depth Capacity : 00.00 – 300.00 m .
HQ rods ( OH)
Drilling Performance:
Open Hole : 100.00 m /shift
Core HQ3 : 70 meter/shift
PT. Jhonlin Group ( Year 2017 )
33Location : Konawe Utara - Kendari , Sulawesi TenggaraExploration OF Mineral(Nickle)
Depth Capacity : 0 . 00 - 50.00 m . Unit rig DBM 240
HQ rods ( Full Coring )
Drilling Performance:
Full Coring: 20.00 - 40.00 m /shift
PT.Jhonlin Group ( Year 2018 )
34Location : Tanjung , Kalimantan SelatanExploration OF Coal
Depth Capacity : 0 . 00 - 150.00 m . Unit rig DBM 240
HQ rods
Drilling Performance:
Touch Coring : 50.00 - 150.00 m /shiftt
PT. Semesta Centra Mas / Balangan Coal ( Year 2018 )
35Location : Tawahan , Kalimantan SelatanExploration of CoalCompleted
Unit rig DBM 200 ( SPT ), DBM 240 +, (11 April 2018 – 15 Agustus 2018)
Depth Capacity : 0.00 –160.00 m .
HQ rods – Incline
Drilling Performance:
Full Coring :20.00-60.00 m /shift ( 0 Derajat / Vertikal )
Full Coring :20.00-60.00 m /shift ( 60 Derajat / Incline )
PT. Arutmin Indonesia( Year 2018 )
36Location :Kintap , Kalimanatan SelatanExploration of CoalCompleted
Unit rig Cortech 1300, DDM 240(18 Juli 2018 – 11 Oktober 2018)
Depth Capacity : 0 . 00 - 200.00 m .
HQ rods ( OH , TC)
Drilling Performance:
Open Hole: 90- 120.00 m /shift
Full Coring: 70 - 80.00 m /shift
PT.Jhonlin Batu Mandiri ( Year 2018 )
37Location : Bombana , Sulawesi TenggaraWater Well
Depth Capacity : 0 . 00 - 200.00 m . Unit rig HXY 4 T
DP Rods
Size Hole 12” ( Water Well )
PT. Asmin Bara Bronang ( Year 2018 )
38Location : Mamput , Kalimantan TengahExploration of CoalCompleted
Unit rig DBM 240, DBM 240, DDM 300 dan DBM 400(21 Juli 2018 – 09 Juni 2019)
Depth Capacity : 00.00 - 120.00 m .
HQ rods ( OH)
Drilling Performance:
Open Hole : 00.00 m - 60.00 m /shift
Core HQ3 : 20 – 30 meter/shift
PT. Kapuas Prima Coal Tbk. ( Year 2018 )
39Location : Lamandau , Pangkalanbun . Kal - tengExploration of MineralCompleted
Unit Rig Cortech/DBM 1300 L : 2 Unit, (06 September 2018 – 14 Oktober 2019)
Depth Capacity : 0.00 m - 600.00 m .
HQ rods
Full Coring
PT. Laskar Semesta Alam / Balangan Coal ( Year 2018 )
40Location : Tawahan , Kalimantan SelatanExploration of CoalCompleted
Unit rig DBM 240 +, (4 Unit)(01 September 2018 – 26 Juni 2019)
Depth Capacity : 0.00 –300.00 m .
HQ /NQ rods – Incline
Drilling Performance:
Full Coring :20.00-60.00 m /shift ( 0 Derajat / Vertikal )
Full Coring :20.00-60.00 m /shift ( 60 Derajat / Incline )
PT. Paramitha Cipta Sarana / Balangan Coal ( Year 2018 )
41Location : Tawahan , Kalimantan SelatanExploration of CoalCompleted
Unit rig DBM 240 +, (2 Unit)(15 Oktober 2018 – 31 Mei 2019)
Depth Capacity : 0.00 –200.00 m .
HQ / NQ rods – Incline
Drilling Performance:
Full Coring :20.00-60.00 m /shift ( 0 Derajat / Vertikal )
Full Coring :20.00-60.00 m /shift ( 60 Derajat / Incline )
PT. Sumber Energy Jaya ( Year 2018 )
42Location : Ratatotok, Manado , Sulawesi UtaraExploration of MineralCompleted
Unit Rig DBM 400 : 2 Unit,Cortech 2 Unit . (13 Nopember 2018 – 30 Oktober 2020)
Depth Capacity : 0.00 m - 500.00 m
HQ rods Full coring
PT. Adaro Jasabara Indonesia ( Year 2019 )
43Location : PT Adaro Indonesia .Tanjung - Kal -SelExploration of CoalCompleted
Unit Rig Cortech/DBM 1300 L : 1 Unit, (15 Juni 2019 – 31 Januari 2020)
Depth Capacity : 0.00 m - 400.00 m .
HQ & NQ rods
Full Coring
PT. Asmin Bara Bronang ( Year 2019 )
44Location : Mamput , Kalimantan TengahExploration of CoalIn Progress
Unit rig DBM 240, DBM 240, DBM 300 dan DBM 400(24 Juli 2019 – Sekarang)
Depth Capacity : 00.00 - 120.00 m .
HQ rods
Drilling Performance:
Open Hole : 00.00 m - 80.00 m /shift
Core HQ3 : 20 – 30 meter/shift
PT. Paramitha Cipta Sarana ( Year 2020 )
45Location : Tawahan , Kalimantan SelatanExploration of CoalCompleted
Unit rig DBM 240 +, (4 Unit)(01 Juli 2020 – 13 September 2020)
Depth Capacity : 0.00 –200.00 m .
HQ Rods – Incline
Drilling Performance:
Full Coring :20.00-60.00 m /shift ( 0 Derajat / Vertikal )
Full Coring :20.00-60.00 m /shift ( 60 Derajat / Incline )
PT. Marunda Graha Mineral ( Year 2020 )
46Location : Tawahan , Kalimantan SelatanExploration of CoalIn Progress
Unit rig DBM 240 , (2 Unit) DBM175 (2 unit)(16 Oktober 2020 – Sekarang)
Depth Capacity : 0.00 –150.00 m .
AW & HQ Rods
PT. Qinfa Mining Industri ( Year 2021 )
47Location : Magalau , Kalimantan SelatanExploration of CoalCompleted
Unit rig DBM1000 (Cortech) 2 Unit & DBM800 1 Unit(20 Januari 2021 – 05 Juni 2021)
Depth Capacity : 0.00 –800.00 m .
HQ Rods
PT. Arutmin Indonesia( Year 2021 )
48Location : Serongga , Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 400 (2 Unit)(15 Februari 2021 – 31 Desember 2021)
Depth Capacity : 0 - 250 m .
HQ rods ( Open Hole, Coring & Full Coring)
Unit Desa Gajah Mada ( Year 2021 )
49Location : Serongga , Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 240 (4 Unit)(01 Juli 2021 – 31 Agustus 2021)
Depth Capacity : 0 - 200 m .
HQ rods ( Open Hole & Full Coring)
PT. Laskar Semesta Alam ( Year 2021 )
50Location : Tanjung, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 240 (2 Unit)(06 Juli 2021 – 05 November 2022)
Depth Capacity : 0 - 150 m .
HQ rods (Full Coring)
PT. Semesta Centra Mas ( Year 2021 )
51Location : Tanjung, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 240 (2 Unit)(06 Juli 2021 – 17 September 2021)
Depth Capacity : 0 - 150 m .
HQ rods (Full Coring)
PT. Baramega Citra Mulia Persada ( Year 2021 )
52Location : Serongga , Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 400 (2 Unit)(27 Juli 2021 –22 September 2022)
Depth Capacity : 0 - 200 m .
HQ rods ( Open Hole & Full Coring)
PT. Adaro Indonesia ( Year 2021 )
53Location : Tanjung, Kalimanatan SelatanExploration of CoalIn Progress
Unit rig DBM 1.000 (1 Unit)(29 Juli 2021 – Sekarang)
Depth Capacity : 0 - 300 m (Drain Hole & Geotec)
HQ rods ( Open Hole & Full Coring)
PT. Jhonlin Baratama ( Year 2021 )
54Location : Angsana, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 300 (2 Unit) & Cortech/DBM 1300 L (2 Unit)(23 Agustus 2021 – 16 Juni 2022)
Depth Capacity : 0 - 200 m .
HQ rods (Full Coring)
PT. Jhonlin Baratama ( Year 2021 )
55Location : Angsana IUP PT. GAJ, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 300 (2 Unit) & DBM 400 (2 Unit)(27 Agustus 2021 – 31 Maret 2022)
Depth Capacity : 0 - 200 m .
HQ rods (Full Coring)
PT. Kutai Energi ( Year 2021 )
56Location : Batuah, Kalimanatan TimurExploration of CoalCompleted
Unit rig DBM 240 (8 Unit) (20 November 2021 – 30 Juni 2022)
Depth Capacity : 0 - 100 m.
Drilling Incline 45°
HQ rods (Open Hole & Full Coring)
CV. Rizki Mulia Bara ( Year 2022 )
57Location : Angsana, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 400 (2 Unit)(13 Januari 2022 – 25 Juni 2022)
Depth Capacity : 0 - 200 m .
HQ rods (Full Coring)
PT. Sumber Daya Energi ( Year 2022 )
58Location : Magalau , Kalimantan SelatanExploration of CoalCompleted
Unit rig DBM1000 (Cortech) 1 Unit(10 Januari 2022 – 05 Februari 2022)
Depth Capacity : 0.00 –600.00 m .
HQ Rods
CV. Sarana Usaha ( Year 2022 )
59Location : Angsana, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 400 (1 Unit)(13 Februari 2022 – 15 Maret 2022)
Depth Capacity : 0 - 200 m .
HQ rods (Full Coring)
PT. Dua Samudera Perkasa ( Year 2022 )
60Location : Angsana, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 400 (1 Unit)(20 Juni 2022 – 07 Agustus 2022)
Depth Capacity: 0 - 20 m.
HQ rods (SPT)
PT. Asmin Bara Jaan ( Year 2022 )
61Location : Mamput , Kalimantan TengahExploration of CoalCompleted
Unit rig DBM 240, DBM 240, DBM 300 dan DBM 400(30 Juni 2022 – 16 Agustus 2022)
Depth Capacity : 00.00 - 120.00 m .
HQ rods
Drilling Performance:
Open Hole : 00.00 m - 80.00 m /shift
Core HQ3 : 20 – 30 meter/shift
PT. Indo Sejahtera Manunggal ( Year 2022 )
62Location : Tanjung, Kalimanatan SelatanExploration of CoalCompleted
Unit rig DBM 240 (2 Unit)(12 Juli 2022 – 01 September 2022)
Depth Capacity : 0 - 150 m .
HQ rods (Full Coring)
PT. Jhonlin Baratama ( Year 2022 )
63Location : Angsana IUP PT. SJ, Kalimanatan SelatanExploration of CoalIn Progress
Unit rig DBM 800 (2 Unit) & DBM Cortech (1 Unit)(24 Agustus 2022 – Sekarang)
Depth Capacity : 0 - 700 m .
HQ rods (Full Coring)
PT. Gunung Bayan Primacoal ( Year 2022 )
64Location : Tanjung, Kalimanatan SelatanExploration of CoalIn Progress
Unit rig DBM 300 (4 Unit) & DBM175 (4 Unit)(01 September 2022 – Sekarang)
Depth Capacity : 0 - 150 m .
HQ rods (Full Coring)